Construction plan Fix Step

with closed gap

deck2 fixstep fuge geschlossen en #1 #2 #3 #4 #5 #6 #7 #8 #9b #10 #11 #12 #13 #14 #15b1 #15b2 #4b

Overview

unterbau fixstep erhoeht

With the megawood® Fix Step System, we offer you a continuous and sophis-ticated system from the clickable construction beams to the locking clamp. This system is characterised by simple handling and fast laying. Time-con-suming preparation work tasks such as pre-drilling in concrete are now a thing of the past. Your megawood® construction plan will tell you just how this can be done. With the megawood® Fix Step System, you have chosen the easiest way to lay your deck, irrespective of whether you want an open or closed gap. Thanks to its lightness, the Fix Step is also suitable for a floating laying style on roof terraces. And with the variable height adjustment, even existing, or uneven paved area are perfectly built over in the shortest of times.


megawood® Groove strip

Nutleiste FSS 9a 1

 


megawood® Smooth edge board

glattkantbrett geschlossen

 


FIX STEP - Variable hights

aufbauhoehen fixstep erhoeht

Laying variants

Laying on mitres for L, U, O-shaped terraces

gehrungsprofil en

Use of the mitre profile. Double sub-construction along the 45° section. Insert sealing tape into the mitre joint on both sides. Only push the floorboard into the mitre profile by 10 mm in order to ensure the expansion.

Article overview

Fix Step DUO edge panel 280 x 260 x 71 mm

Fix Step DUO edge panel 280 x 260 x 71 mm

Fix Step standard panel 270 x 180 x 71 mm

Fix Step standard panel 270 x 180 x 71 mm

Fix Step DUO edge mounting 250 x 60 x 55 mm

Fix Step DUO edge mounting 250 x 60 x 55 mm

Fix Step standard mounting 116 x 60 x 55 mm

Fix Step standard mounting 116 x 60 x 55 mm

Construction beams 40 x 60 mm | L: 360 cm

Construction beams 40 x 60 mm | L: 360 cm

Connecting clip

Connecting clip

Assembly clip

Assembly clip

Fix Step perforated tape L: 10 m (on a roll)

Fix Step perforated tape L: 10 m (on a roll)

M6 x 16 Fastening screw for perforated tape

M6 x 16 Fastening screw for perforated tape

Groove bridge  55 x 8 x 10 mm

Groove bridge 55 x 8 x 10 mm

Retaining band L: 10 m (self-adhesive)

Retaining band L: 10 m (self-adhesive)

House connection profile

House connection profile

Fix Step rubber pad  300 x 300 mm | Stärke 3/5/10 mm

Fix Step rubber pad 300 x 300 mm | Stärke 3/5/10 mm

Smooth edge board

Smooth edge board

M8 x 80 fastening screw for smooth edge board

M8 x 80 fastening screw for smooth edge board

Screw set 4 x 35 mm

Screw set 4 x 35 mm

Locking clamp

Locking clamp

Locking clamp edge

Locking clamp edge

Clip

Clip

Edge clip

Edge clip

Groove strip

Groove strip

Fix Step attachment 79 x 58 x 83 mm

Fix Step attachment 79 x 58 x 83 mm

FIX STEP comfort pad

FIX STEP comfort pad

Mitre profile (laying on mitres)

Mitre profile (laying on mitres)

back

 
  • Attach the Fix Step fixtures centrally using a strip of retaining band, click into the panels and position, ensure the height adjustment is identical.
  • Position the FIX STEP DUO edge panels at the start of the terrace, distribute the FIX STEP standard fixtures in a parallel manner – pay attention to distances!
  • Position further FIX STEP DUO edge panels at the end of the terrace.
  • If required, turn the external FIX STEP panels in order to prevent a protrusion of the construction beams.
  • In the event of terrace lengths above 360 cm, position FIX STEP DUO smooth edge boards in the area of the smooth edge board butt joint.
  • With the smooth side facing upwards, click the construction beams (40 x 60 mm) into the FIX STEP fixtures.
  • If the terrace width is greater than 360 cm, always arrange the construction beam joints in an offset manner.
  • Cut the connecting clip to 32 cm, connect the beam joints with this clip and then tightly screw on one side.
  • Position the smooth edge boards and construction beam joints in the same location.
  • Recess the connecting clip measuring 2 cm in width and 1 cm in depth in order to assemble the smooth edge board in the area of the screw connection at a later date – Align the construction beams exactly!
  • Position perforated tape beneath the construction beams and screw on to all construction beams using an assembly clip.
  • Saw into the construction beam, lock the locking clamp edge in the groove.
  • Adhere the retaining band to the construction beam located centrally beneath the floorboards.
  • Insert the first floorboard into the house connection profile (optional) and then push into the positioned edge clamps.
  • Place the locking clamps on to the construction beam and lock using pliers (alternatively the „Zammer“). Place the groove strip on to the fully assembled locking clamp and, together, push into the floorboard groove.
  • If there is a groove in the construction beam, it may be necessary to use a groove bridge in order to also be able to securely fasten the locking clamp in the gap area.
  • Take an intermediate measure after every three rows of floorboards and attach locking clamps to the construction beams in every third row of floorboards, repeat up until the penultimate floorboard.
  • Cut the construction beams to size and ensure they are flush – repeat Step 6!
  • Cut the frontal side of the floorboards to size with a 1.5 cm protrusion, chamfer the cutting edge.
  • The frontal side of the smooth edge boards must be 1.2 cm shorter than the construction beams at the end of the terrace – pay attention to distances!
  • Assemble construction beam units measuring 8 cm in length complete with assembly clip at the start and end of each construction beam.
  • Screw double pieces on to the terrace corners using two assembly clips, indent the DUO panel where necessary.
  • Frontal side and longitudinal side assembly of the smooth edge boards.
  • In the event of a double smooth edge board, assemble construction beam units measuring 8 cm in length on to each connecting clip using screws.
Cookies make it easier for us to provide you with our services. With the usage of our services you permit us to use cookies.
More information Ok