Construction concrete edge stone

with closed gap

deck4 beton fuge geschlossen en #1b #2b #3b #4 #5b #6b #7b #8b #9b

Overview

unterbau betonrandstein erhoeht


Closed gap

Nutleiste

 

 

Article overview

Construction beams 90 x 90 mm

Construction beams 90 x 90 mm

Sub-construction screw 90/90

Sub-construction screw 90/90

Retaining band L: 10 m (on a roll), self-adhesive

Retaining band L: 10 m (on a roll), self-adhesive

Rubber pad 3/10/20 mm

Rubber pad 3/10/20 mm

Fastening screw M8 x 80

Fastening screw M8 x 80

Smooth edge board 17 x 72 mm

Smooth edge board 17 x 72 mm

Clip

Clip

Edge clip

Edge clip

Groove strip

Groove strip

Mitre profile (Laying on mitres)

Mitre profile (Laying on mitres)

back

 
  • Lay concrete edge stones (100 x 25 x 5 cm) at a centre distance of 75 cm on the gravel bed with gradient, turn the frontal side inwards by 10 cm in the direction of the construction beams.
  • Evenly distribute the construction beams (90 x 90 mm) transversely to the concrete edge stones (groove at the bottom), pay attention to a 10 cm protrusion.
  • Arrange two beams respectively at the start and the end. Lay 10 mm rubber pads beneath the construction beams, compensate for possible gradient differences using further rubber pads.
  • In the event of a terrace width greater than 360 cm, always arrange the construction beam joints in an offset manner (distance of 1 cm).
  • Align the construction beams, screw the sub-construction in the edge area as well as both start and end beams to the middle beam. Cut the construction beams to size, ensuring they are flush, 10 cm protrusion.
  • The 12 cm long construction beams measuring 60 x 40 cm are placed upright and then fastened to the ends of the construction beams on the left and right hand sides.
  • Adhere the retaining band to the construction beam located centrally beneath the floorboards.
  • Screw the edge clip flush to the end of the construction beams in order to fix the floorboard into place.
  • Following assembly of the first floorboards, push the house connection profile as a border strip to the house facade to the end of the floorboard (optional). Fix the floorboards with a clip. Tighten the screw in such a manner that the clip is parallel to the sub-construction.
  • Loosely insert the groove strip into the floorboard groove, apply the next floorboard, push on to the groove strip, fix the floorboard using the clip.
  • Repeat the process until the terrace is fully laid.
  • Cut the floorboards to size in the edge area facing the construction beams, chamfer the cutting edge. See Figures 9a and 9b.
  • The frontal side of the smooth edge boards must be 1.2 cm shorter than the construction beams at the end of the terrace - pay attention to distances!
  • Circumferentially fasten smooth edge boards to the sub-construction. On the frontal side, screw the smooth edge board to the sub-construction beams.
  • Screw every 50 cm in a parallel manner along the construction beams, apply spacer screws between the smooth edge board and the construction beam.