Laying on old terraces

Verleg alter 02

 


Herringbone pattern

Schiffsverband

 


Open gap

unterbau betonrandstein


Construction at floor level

The terrace deck is constructed at a deeper level so the structure forms a single level with the surrounding ground surface. May only be constructed as a deck with open gap in order to ensure ventilation. A min. distance of 4 cm between the construction beams and rising, solid components must always be observed. A min. distance of 2 cm between the floorboards and rising, solid components must always be observed. Not suitable for Signum and Dynum floorboards if sufficient ventilation/rear ventilation cannot be ensured.

ebenerdiger aufbau


 Laying on roof terraces

Verlegung auf Dachterrassen


 

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.